Phú Quốc International Airport
Phu Quoc Island, Vietnam

Phú Quốc International Airport
Modern island gateway serving Vietnam's tropical resort destination.
- ›The airport replaced an older, smaller airstrip that had served the island for decades.
- ›Phú Quốc Island was granted special economic zone status, boosting air traffic development.
- ›The airport is located in the southern part of the island near Duong Dong town.
- ›International arrivals surged significantly following visa liberalization policies introduced for Phú Quốc.
- ›The facility was designed with capacity expansion in mind to meet growing tourist demand.
Route map (3 destinations)












Airlines serving this airport
Routes
Aircraft operating here
Pick what matters for your layover or early flight, then compare on your favorite booking site.
IndianAirports may receive compensation when you book or purchase through some of the links on this page, at no additional cost to you. Prices and availability are set by the booking provider and may change. We never share your private trip details with partners — only the destination, dates and party size you searched.
City & Place Guide
No guide exists for this place yet — Click to generate a Traveler Pulse guide.
Passport, Visa & Immigration
Flying internationally via PQC? Check entry, transit and customs requirements for Vietnam from official government sources.
Phu Quoc International Airport is an international airport that serves Phú Quốc Island, in southern Vietnam. It covers nearly 900 hectares of land in the former commune of Dương Tơ, about 9 kilometres (5.6 mi) south of the administrative centre of Phu Quoc special zone. It is built at a cost of around VND 16.2 trillion and is planned to be built in phases. The airport is 10 km from the previous Phu Quoc Airport, which it replaced in December 2012. The airport was initially able to handle about 2.5 million passengers per annum, and the maximum capacity will be 7 million passengers per annum. The airport has a single runway, capable of handling aircraft like the Airbus A350 and Boeing 747. The construction was completed in November 2012 and was put into operation on 2 December 2012. The Government of Vietnam expects the airport to facilitate the arrival of international tourists who are attracted to the island's beaches.
Read full article on Wikipedia
Translate